22 Hrs
Source:
السوسنة
Source: السوسنة
22 Hrsالسوسنة
Source: السوسنة
22 HrsReady to play
Ready to play
The head of the Construction Department at the Greater Amman Municipality, Hani Al-Marashdeh, said that water accumulation in the capital results from heavy rainfall and rapid runoff, as well as the mountainous terrain and steep slopes, which can wash soil and debris into drainage networks and temporarily obstruct them. He said the water usually begins to recede once the rain stops or eases, and in most locations it remains for no more than about ten minutes, while crews work to clear obstructions. He added that the municipality continues to improve drainage at previously identified sites by building culverts and carrying out infrastructure projects.
Notice: This Is an AI-Generated Summary
Comments (0)