6 Hrs
Source:
الوكيل الإخباري
Source: الوكيل الإخباري
6 Hrsالوكيل الإخباري
Source: الوكيل الإخباري
6 HrsReady to play
Ready to play
The Ministry of Public Works and Housing confirmed that the detour on the Rameh–Joufeh Road is temporary. It was built to serve residents after the old bridge was closed and demolished because heavy rains had worsened the cracks. The ministry has begun building a new bridge at the site. The detour includes culverts to drain floodwater. It is closed when water levels rise for safety reasons, and reopened once the water recedes and the route is confirmed safe. The ministry urged residents to use alternative routes, including the Kafrein and Maghtas roads. A route for local traffic will remain available during construction.
Notice: This Is an AI-Generated Summary
Comments (0)