6 Hrs
Source:
الحقيقة الدولية
Source: الحقيقة الدولية
6 Hrsالحقيقة الدولية
Source: الحقيقة الدولية
6 HrsReady to play
Ready to play
The Ministry of Public Works and Housing confirmed that the alternative route on the Rameh–Jufeh road is temporary. It was built to maintain residents’ access after the old bridge was closed and demolished ahead of its replacement; work on the new bridge has begun. The route includes pipe culverts to drain floodwater. For safety, it is closed when water levels rise and reopened once the water recedes and the route has been confirmed safe for use. The alternative route will remain available for local traffic throughout the project. The Ministry urged road users to take alternative routes.
Notice: This Is an AI-Generated Summary
Comments (0)