1 Day
Source:
خبرني
خبرني
Ready to play
Ready to play
The Ministry of Public Works and Housing will begin maintenance work on sections of the Ghor Road on Sunday, November 8, 2026, along the stretch from Wadi al-Manshala Bridge toward the Lower Wadi al-Mujib Bridge. The work will include milling the old asphalt, repairing sunken and deformed sections, laying polymer-modified asphalt layers, and installing road markings and reflectors. Maintenance will be carried out in phases, with one lane kept open and traffic diverted when necessary. The ministry urged drivers to slow down and follow road signs and the instructions of workers.
Notice: This Is an AI-Generated Summary
Comments (0)