الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
The Ministry of Public Works and Housing has begun implementing a comprehensive plan to maintain the main roads in the Central Region, aimed at improving traffic safety and enhancing infrastructure efficiency. The plan includes repairing damaged asphalt mixes, developing rainwater drainage systems, and protecting water installations along the roads. Key routes involved are Al-Muqir, Al-Matar Airport, the Royal Dead Sea Road, and the Dead Sea Highway. The project costs approximately two million Jordanian dinars and will continue for no longer than 180 days, with coordination with the Traffic Department to ensure the smooth flow of traffic during the implementation period.
Notice: This Is an AI-Generated Summary
Comments (0)