16 Days
Source:
خبرني
خبرني
Ready to play
Ready to play
The Ministry of Public Works and Housing announced the start of work to address hot spots on the main Wadi Araba Road in the Grandel area, aiming to improve rainwater drainage efficiency and ensure road safety. The project includes the construction of new box culverts and pipe systems, as well as maintenance and development of water drainage systems. Its goal is to reduce the frequency of road closures during heavy rain and flood conditions. The implementation will require a temporary closure of the section and diverting traffic to a detour route for up to 30 days to ensure service continuity and safety.
Notice: This Is an AI-Generated Summary
Comments (0)