جراءة نيوز
جراءة نيوز
Ready to play
Ready to play
The Higher Steering Committee for the Fahes Al-Reef Project approved the distribution of electricity to 199 homes and sites, at a total cost of 1.053 million dinars. This effort is part of the expansion of electricity services in rural areas. The projects included supporting homes both outside and inside planned areas, as well as farms and agricultural and service sectors. Emphasis was placed on providing sustainable energy through the installation of solar panel systems for low-income and impoverished families. This initiative aligns with the ministry's efforts to strengthen infrastructure, develop the agricultural sector, and support economic projects in the region.
Notice: This Is an AI-Generated Summary
Comments (0)