Ready to play
Ready to play
Electrical loads in Kuwait reached a record high as temperatures hit 50 degrees Celsius, leading to a partial and temporary power outage in the Shuwaikh and Jleeb areas. Emergency teams successfully restored power in record time after repairing faults caused by the high demand and soaring temperatures, which resulted in three transformers and main lines going out of service. Sources confirmed the stability of the electrical grid and assured that technical teams are prepared to handle any incidents to ensure continuous service.
Notice: This Is an AI-Generated Summary
Comments (0)