Ready to play
Ready to play
The Ministry of Electricity, Water, and Renewable Energy is preparing to begin its annual maintenance season for the electricity and water network components starting mid-September 2026. The goal is to enhance the readiness of the production system to handle high loads during the upcoming summer. This comes after a decrease in temperatures and a relief in pressure on the network, following the ministry's successful efforts during this summer to avoid major outages and ensure stability despite temperatures exceeding 49 to 50 degrees Celsius. The maintenance plan includes meticulous coordination among the relevant authorities to ensure the orderly restart of production units based on necessity, with close monitoring by the Minister and deputies to ensure adherence to the schedules. Additionally, the ministry will release a detailed report evaluating performance, highlighting the highest electrical loads, water consumption rates, and comparing them with previous years to strengthen preparations for the next summer season.
Notice: This Is an AI-Generated Summary
Comments (0)