18 Hrs
Source:
الكتائب اللبنانية
الكتائب اللبنانية
Ready to play
Ready to play
The update from the Ministry of Public Works and Transport regarding the construction of a temporary ferry at the Qaqa'iyya Bridge on the Litani River includes installing pipelines to address the damaged area, with the goal of reopening traffic flow between the riverbanks and connecting the Nabatieh District with Bint Jbeil. These efforts are considered a priority to ensure continuity of mobility and maintain local connectivity in South Lebanon. Since the bridge is a vital link in the local road network, the Ministry continues to oversee the work to complete the project and rehabilitate the damaged infrastructure.
Notice: This Is an AI-Generated Summary
Comments (0)