1 Hr
Source:
الكتائب اللبنانية
الكتائب اللبنانية
Ready to play
Ready to play
The Lebanese Ministry of Communications has decided to grant a 30-day period for devices that do not receive SMS messages, such as Internet of Things devices, modems, routers, and GPS devices, to complete their activation procedures. This aims to ensure these devices comply with relevant legal and technical requirements. The grace period is intended to facilitate the activation process without waiving fees or conditions. The ministry emphasizes that relevant companies must complete the necessary procedures within the specified timeframe to avoid legal actions against devices that remain inactive.
Notice: This Is an AI-Generated Summary
Comments (0)