3 Hrs
Source:
صوت بيروت إنترناشونال
صوت بيروت إنترناشونال
Ready to play
Ready to play
The Ministry of Energy and Water confirmed that the decision to install solar panels with a capacity of less than 1.5 megawatts aims to facilitate the use of renewable energy and reduce costs. It includes instructions to regulate installation processes and ensure quality. The ministry did not mention any additional figures or technical details regarding procedures or outcomes.
Notice: This Is an AI-Generated Summary
Comments (0)