قناة المنار
Source: قناة المنار
14 Hrsقناة المنار
Source: قناة المنار
14 HrsReady to play
Ready to play
Iran’s Acting Minister of Oil, Hamid Bord, announced that gas production lost after a fire at Platform D in Phase 14 of the South Pars gas field had been made up. He said preparations were under way to rehabilitate the platform and resume production, with no casualties reported. Repair teams are working three shifts a day to speed up the rebuilding of the platform and damaged refineries, and production capacity is expected to increase by December 21, 2026. Bord said Iran lost around 230 million cubic meters of gas production capacity during the war, while the gap between supply and demand reaches about 250 million cubic meters at peak consumption. He urged residents to cut their gas use by 20% over the winter.
Notice: This Is an AI-Generated Summary
Comments (0)