Ready to play
Ready to play
The electricity network in Benghazi experienced sudden outages due to high humidity levels, which caused some wires to fall and led to interruptions in certain electrical circuits. In response to these events, maintenance teams carried out corrective and repair work to ensure stable power supply, including fixing the wires that supply areas such as Qaryounes and the road leading to Tripoli.
Notice: This Is an AI-Generated Summary
Comments (0)