127 Days
Source:
بوابة الوسط
Source: بوابة الوسط
127 Daysبوابة الوسط
Source: بوابة الوسط
127 DaysReady to play
Ready to play
Electric poles in Benghazi have fallen as a result of vehicle collisions, causing power outages in the southeastern areas of the city. These incidents led to a loss of approximately 7 megawatts of electrical load. Maintenance crews acted quickly to repair the damages and restore power, while citizens are urged to be cautious and refrain from tampering with the electrical network due to safety risks.
Notice: This Is an AI-Generated Summary
Comments (0)