66 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The General Electricity Company announced that emergency maintenance is being carried out at the Serri Gas Power Plant to ensure the efficient operation of the units and the stability of the power grid. The work included replacing the "chance filter" for Unit 2 and inspecting the transformer cooling fans, all without affecting electricity supplies. This maintenance aims to enhance operational continuity and improve the plant's performance.
Notice: This Is an AI-Generated Summary
Comments (0)