66 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The water and sewer teams in Tripoli carried out urgent maintenance work on a water line on Al-Zawia Street after receiving a report of a water leak caused by a malfunction in a three-inch diameter pipeline. The malfunction was repaired within a few hours. Additionally, sewage suctioning was carried out in the Arada area to address sewage overflow resulting from illegal connections to the drainage lines. These efforts are part of the company's initiatives to maintain the continuity of public services and address emergency malfunctions.
Notice: This Is an AI-Generated Summary
Comments (0)