61 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The electricity company in Tripoli successfully repaired a damaged high-voltage cable in the industrial district. The technical teams installed two connections on line unit (30) to restore the electrical supply and stabilize the network, with clear efforts to ensure continuous service as the teams worked under the scorching sun.
Notice: This Is an AI-Generated Summary
Comments (0)