56 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
Water production at the Sareer Field has stopped due to a power outage at the station, resulting in 92 wells going out of service and a daily production of approximately 611,000 cubic meters of water. The outage was caused by the failure and disconnection of the 66-kilovolt transformers at the Western Sareer station. Efforts are underway to repair the fault and restart the wells as soon as possible.
Notice: This Is an AI-Generated Summary
Comments (0)