56 Days
Source:
وكالة الأنباء الليبية
وكالة الأنباء الليبية
Ready to play
Ready to play
The wells at Al-Sareer station have been restarted after repairing a fault in the transformers at the Western Sareer Station, which caused 92 wells to cease operation since this morning. The technical teams contributed to restoring the power supply and have begun the gradual process of restarting the wells to resume water production for urban and agricultural uses.
Notice: This Is an AI-Generated Summary
Comments (0)