54 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
Repair of a malfunction at the Misrata station in Libya led to a power outage in areas of Benghazi. Maintenance teams were able to fix the problem, which was caused by rodents entering the station and damaging the transformer circuit. It took over five hours to fully restore power and ensure electrical supply stability in the region.
Notice: This Is an AI-Generated Summary
Comments (0)