29 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The General Electricity Company of Libya announced the dispatch of six transformers with capacities ranging from 50 kVA to 1000 kVA to the Western Coast Distribution Department, aimed at supporting maintenance operations and improving the reliability of the electrical distribution network. This initiative is part of efforts to restore stability and repair the network after some transformers malfunctioned. Additionally, wires and insulators have been dispatched for the West Tripoli-Tiba line, with maintenance teams ready to install the equipment as soon as it arrives to enhance power stability and improve service levels for citizens.
Notice: This Is an AI-Generated Summary
Comments (0)