بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The Ministry of Water and Irrigation in Libya announced the reactivation of 15 wells in the Tazrubbo field, increasing the field's production to 420,000 cubic meters per day compared to 300,000 before maintenance. This effort is part of the authority's initiatives to improve water supplies across the country, including bringing a previously out-of-service well back into operation, rehabilitating and restarting eight wells that had stopped due to low flow, and activating five wells that had ceased operation because of deteriorated plastic rings and the treatment plant going offline. These actions have contributed to an increase in production by 120,000 cubic meters per day, despite facing challenges such as limited funding, fluctuations in electricity supply, and rising temperatures. Officials emphasized the ongoing efforts of the workers to ensure the continuous delivery of water to various regions in Libya.
Notice: This Is an AI-Generated Summary
Comments (0)