58 Mins
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
A report states that the Libyan Industrial River Project Implementation and Management Authority announced that a station in Zliten has been targeted in an attack for the third time since 2022, resulting in a high-pressure water leak in the transfer line. Despite efforts by technical teams to control the leak and carry out repairs, repeated attacks threaten water security and disrupt supplies. There is a warning that these recurring assaults could lead to water shortages in the affected areas and put the lives of the technical crews at risk.
Notice: This Is an AI-Generated Summary
Comments (0)