10 Hrs
Source:
أخبار ليبيا 24
أخبار ليبيا 24
Ready to play
Ready to play
The Industrial Nile faced the deactivation of 143 wells in the Serri and Tazribou fields due to power outages, leading to a temporary reduction in water supplies to protect the system. After electricity was restored, operations returned to normal. However, the crisis highlighted a heavy dependence on continuous power supply to ensure the sustainability of water deliveries.
Notice: This Is an AI-Generated Summary
Comments (0)