بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The Libyan Ministry of Electricity in Benghazi successfully conducted initial technical tests on the North Generation/Al-Salam District cable at a voltage of 220 kV, which increases the likelihood of it being reactivated within 48 hours. The cable, which suffered severe damage last March due to excavations, was one of the most important power transmission routes in the city. Its damage caused disruptions in electricity distribution and outages at some stations and residential neighborhoods. Restoring the cable will help ease the load on the Garden/North Generation cable, improve grid stability, eliminate the power outage problems the city has been experiencing, and enhance load distribution efficiency during peak times.
Notice: This Is an AI-Generated Summary
Comments (0)