Ready to play
Ready to play
The General Electricity Company of Libya has launched two new stations operating at voltages of 11/30 kV from the stores in the Qara Palah area to support the transformer station projects in Benghazi. The aim is to improve the electrical network, address bottlenecks, and increase the stability of the power supply. Additionally, the Twaqra station (66/11 kV voltage) has received the necessary equipment to begin installation work and connect it to the grid as part of a plan to strengthen the stability of the electrical system in the region. These measures aim to enhance the efficiency of the electricity network and provide stable power for citizens, with plans also signed for implementing innovative and sustainable projects.
Notice: This Is an AI-Generated Summary
Comments (0)