1 Day
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The National Oil Corporation of Libya announced the resumption of gas production at the Mellitah Complex after protesters had shut it down, which threatened the country's electricity supplies. The corporation authorized a full restart of the flow and ensured a suitable environment for the return to work at the El-Fil and El-Wafaa fields, as well as the Sabratha platform. It confirmed that the situation is stable and that production has returned to pre-shutdown levels. This development follows the security of the complex by the National Unity Government, which helped restore stability to the electrical grid and initiated a gradual reactivation of the facilities.
Notice: This Is an AI-Generated Summary
Comments (0)