بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The Libyan General Company for Water and Sanitation announced the execution of extensive maintenance work on the water and sewage networks in the city of Tripoli, aimed at enhancing service efficiency and ensuring its continuity. The work included installing shut-off valves on 6-inch water pipelines in the Sports area and cleaning sewage lines in various areas such as Zawia Street and Misrata. Additionally, a deteriorated sewage line was replaced with a new one over six meters long. This maintenance aims to improve water flow, reduce blockages, facilitate future maintenance operations, and elevate the level of services provided to citizens while strengthening the stability of water and sewage supplies in the city.
Notice: This Is an AI-Generated Summary
Comments (0)