24 Hrs
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The General Water and Sewerage Company in Tripoli has announced the completion of maintenance work on a main water line with a diameter of 300 mm in the Gzarra Island area, following a report of a leak in the line. Maintenance teams inspected the site and repaired the leak, restoring the line to its normal operation to ensure the continuation of water supplies and reduce losses in the network. This step is part of efforts to enhance the efficiency of the city's water and sewerage networks.
Notice: This Is an AI-Generated Summary
Comments (0)