21 Hrs
Source:
صحيفة الساعة 24
صحيفة الساعة 24
Ready to play
Ready to play
The restoration of the electrical grid depends on gradual system stability, as the technical team was able to start charging the stations and adjust the pumping plan, allowing for the resumption of operations according to a set timetable.
Notice: This Is an AI-Generated Summary
Comments (0)