عين ليبيا
عين ليبيا
Ready to play
Ready to play
Sert Oil and Gas Production and Manufacturing Company successfully completed the maintenance of well UU-39 in the Al Lahab field and resumed its production with high efficiency. The initial production exceeded 1,200 barrels per day with a very minimal water cut. During the operation, the company followed a precise technical program that involved isolating the water-bearing layer and reducing water intrusion into the producing wells, utilizing cement plugs and advanced engineering analyses. This success reflects the national efficiency of the engineering and technical personnel and represents an important step within the company's plan to increase production capacity and achieve strategic targets. It also underscores the importance of coordination with the Petroleum Corporation and the support of leadership to realize these results.
Notice: This Is an AI-Generated Summary
Comments (0)