عين ليبيا
عين ليبيا
Ready to play
Ready to play
The article focused on the state of the electrical network in the Sidi Khalifa area in Benghazi, where the region is experiencing outages and instability issues due to deteriorated cable routes and the limited capacity of some stations to meet demand. The Ministry of Electricity and Renewable Energy is working on a project to improve the network by replacing 8 kilometers of damaged cable routes and installing a new station inside the Sidi Mansour station to increase electrical capacity. Current efforts also include temporarily reducing loads and disconnecting them intermittently for 5 to 6 hours daily to ensure grid stability, while working on permanent solutions to address the problem. The ministry emphasizes that it is closely monitoring the improvement of grid stability and the completion of projects to provide more reliable and stable electricity supply. It also apologized for the temporary outages, noting that the technical work is necessary and that the implementation times are temporary.
Notice: This Is an AI-Generated Summary
Comments (0)