Ready to play
Ready to play
The technical teams of the General Company for Water and Wastewater are working to repair a subsidence on a public road in the Al-Hadba Al-Keiza area in Tripoli, caused by a leak in a main sewer line with a diameter of 600 mm and at a depth of 3.5 meters. The leak has been detected, and excavation and repair operations have begun to ensure the safety of the area and to rehabilitate the road. The teams continue working until the repair is complete and the effects resulting from the leak and subsidence are addressed.
Notice: This Is an AI-Generated Summary
Comments (0)