17 Hrs
Source:
عين ليبيا
عين ليبيا
Ready to play
Ready to play
The technical and engineering teams belonging to the General Electricity Company of Libya carried out urgent maintenance works in several areas, aimed at improving the efficiency of the electrical grid and reducing outages. The work included welding connections in Tripoli, maintenance on Line 1111 in Sabha, and repairs to a 220 kV cable in Sirte. These efforts are part of an ongoing plan to ensure the stability of power supply and enhance the network's readiness, with continued efforts to restore electricity to residents in the affected areas.
Notice: This Is an AI-Generated Summary
Comments (0)