21 Hrs
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The electricity company announced the continuation of maintenance work on a damaged high-voltage cable at the Sopot station, aiming to repair the fault and ensure the stability of the electrical network. The duration of the repair or its impact on the electricity supply periods for customers was not mentioned.
Notice: This Is an AI-Generated Summary
Comments (0)