20 Hrs
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The General Water Company in Tripoli announced the completion of repairs on a leak in a main water line with a diameter of 300 mm in the Bin Ashour area. The report did not specify the duration of the repair or the extent of the impact on water services, but the work aimed to fix the leak to ensure the stability of water supplies in the area.
Notice: This Is an AI-Generated Summary
Comments (0)