Ready to play
Ready to play
The technical committee from the Operations and Maintenance Department of the Jabal Al-Gharbi area at the General Company for Water and Wastewater has initiated a campaign to remove illegal connections on the 800 mm water pipeline in the Tobruk area. The campaign aims to reduce losses caused by encroachments, improve the efficiency of the water supply system, and ensure stable water access for citizens. Unauthorized connections lead to low water pressure and outages in some areas. The company calls on residents to cooperate and report any encroachments to maintain the sustainability of water services in the city.
Notice: This Is an AI-Generated Summary
Comments (0)