Ready to play
Ready to play
Haroog Oil Operations Company successfully drilled and operated the B79A replacement well in Amal Field as part of the National Oil Corporation’s 2026 plan to enhance productivity. Test results showed an production rate of approximately 2,000 barrels per day, with water cut not exceeding 4%, indicating high-quality execution. This achievement comes within the framework of developing existing fields and increasing production rates in Libya. It aims to support the implementation of six wells to meet the targeted production capacity. The Head of the Corporation, Engineer Masoud Sulaiman, congratulated the working team, emphasizing the importance of this milestone in strengthening Libya’s oil and gas sector.
Notice: This Is an AI-Generated Summary
Comments (0)