Ready to play
Ready to play
The Libyan Ministry of Water Resources of the Government of National Unity confirmed that preparations for the 2026–2027 rainy season are ongoing. This includes conducting field inspections of the Wadi Al-Mojenin Dam equipment. A technical team, accompanied by the dam official, tested the diesel generators, inspected the water drainage tunnel, and checked the water pumping system to ensure their readiness. The results showed that everything is in good condition. Instructions have been issued to continue monitoring and to increase the level of preparedness, with the aim of enhancing safety and readiness to handle any emergencies during the upcoming rainy season.
Notice: This Is an AI-Generated Summary
Comments (0)