13 Hrs
Source:
عين ليبيا
عين ليبيا
Ready to play
Ready to play
The operation of Abu Zayan Reservoir, with a capacity of 300,000 cubic meters, has been announced, along with the opening of the main valve to feed several cities and municipalities in Jabal Nafusa, from Jendouba to Rihab. The system operates two pumps with a production capacity of up to 150,000 cubic meters per day, while maintaining the reservoir’s water level to ensure continuous water supplies. The authority called on municipalities and citizens to rationalize water consumption to ensure fair and sustainable distribution, as part of the water transfer system managed by the National Unity Government in Tripoli.
Notice: This Is an AI-Generated Summary
Comments (0)