عين ليبيا
عين ليبيا
Ready to play
Ready to play
The Ministry of Water Resources announced the completion of maintenance work on three artesian wells in the Zamzam area of Misrata, as part of the "Return of Life" plan by the National Unity Government. The work included breaking the slabs, removing the old well heads, installing new flanges and valves, and connecting the wells to the distribution line. The depths of the wells range between 1,035 and 1,202 meters, and they operate automatically without pumps. The maintenance was carried out by the Executive Device for Well Drilling and Maintenance, under the supervision of the Central Water Zone. The work also involved installing 9-inch diameter pipes and a cement layer at a depth of 255 meters.
Notice: This Is an AI-Generated Summary
Comments (0)