1 Day
Source:
وكالة الأنباء الليبية
وكالة الأنباء الليبية
Ready to play
Ready to play
The maintenance teams affiliated with the Nesma Distribution Department in Tripoli have begun repairing the damage caused by heavy rains and floods to the electrical network. These efforts include repairing overhead lines and replacing damaged poles. The goal is to restore electrical supply and strengthen the stability of the network in the affected areas, after the heavy rains led to floods, property damage, and the municipal authorities declared the area a disaster zone.
Notice: This Is an AI-Generated Summary
Comments (0)