5 Hrs
Source:
صحيفة الساعة 24
صحيفة الساعة 24
Ready to play
Ready to play
The Arabian Gulf Oil Company has announced that it has entered the final stages of a project to replace approximately 100 kilometers of the main transmission line with a 34-inch diameter line. This line connects the Sirir Field to the oil port, with the aim of enhancing the efficiency and safety of oil transportation operations.
Notice: This Is an AI-Generated Summary
Comments (0)