18 Hrs
Source:
وكالة الأنباء الليبية
Source: وكالة الأنباء الليبية
18 Hrsوكالة الأنباء الليبية
Source: وكالة الأنباء الليبية
18 HrsReady to play
Ready to play
Engineering and technical teams from the General Electricity Company are continuing maintenance work on Units 3 and 4 at the Ubari gas-fired power station, in preparation for returning them to service in the coming period. The station has a total capacity of 640 megawatts across four units, two of which are currently operating. The maintenance work aims to increase output and improve the stability of electricity supply in the southern region.
Notice: This Is an AI-Generated Summary
Comments (0)