22 Hrs
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The maintenance work has been announced to repair a technical fault at the Hajara station in Sabha Governorate, aiming to restore the stability of the electrical grid and ensure continuous power supply to connected areas. Efforts to develop the electricity infrastructure are also ongoing, including the project to connect the 220 kV station to the new injection station in Al Khums. Additionally, the new injection station in Derna has successfully passed testing at a voltage of 66 kV; it has been equipped with modern equipment to enhance the reliability of the electrical network and prepare it for operational readiness.
Notice: This Is an AI-Generated Summary
Comments (0)