Ready to play
Ready to play
Aït Abdel Wasseq Roundabout in Beni Mellal Province experienced a flood due to a broken valve supplying water between Aït Massoud Dam and the phosphate washing plant in Khouribga. This caused large water flows and material damages to residents. The incident occurred again, and the area has previously suffered similar damages in past years, raising concerns about its recurrence due to the lack of permanent solutions. Authorities monitored the situation directly and urged residents to conduct a technical assessment of the infrastructure and take preventive measures to ensure the safety of properties and individuals.
Notice: This Is an AI-Generated Summary
Comments (0)