58 Days
Source:
ناظورسيتي
ناظورسيتي
Ready to play
Ready to play
A recent study reveals that wind energy projects in the Al-Hoceima region are most economically viable when turbines are set at a height of 80 meters, as they can produce between 45.3 and 58.7 gigawatt-hours annually, generating profits ranging from 2.2 to 3.1 million dollars. When using equipment at a height of 50 meters or less, efficiency declines and production costs increase due to the area's terrain affecting wind strength and frequency. The study was based on climate data analysis from 2015 to 2023 and showed that the wind potential in Al-Hoceima is moderate compared to other cities.
Notice: This Is an AI-Generated Summary
Comments (0)