18 Hrs
Source:
برلمان.كوم
برلمان.كوم
Ready to play
Ready to play
The Loukkos Watershed Agency is preparing for the winter season by conducting regular technical tests on the Wadi El-Makhazin Dam. These tests include controlled and limited water releases to ensure the readiness of hydraulic and mechanical equipment ahead of the rainy season. The tests began on September 28 and involve assessments of water discharges and flow control downstream of the dam, with the aim of verifying the effectiveness and safety of the facilities for managing water flows during the rainy season.
Notice: This Is an AI-Generated Summary
Comments (0)