12 Hrs
Source:
ناظورسيتي
ناظورسيتي
Ready to play
Ready to play
The field intervention teams in Nador continue to carry out cleaning and maintenance operations on drainage networks to enhance their capacity and improve water flow, especially in preparation for the rainy season. These measures aim to prevent blockages and bottlenecks that could affect the efficiency of water drainage. They target problematic spots and main corridors in the network to ensure the protection of infrastructure and residential areas from flooding. These operations are part of the strategy to upgrade and rehabilitate the sewer systems in the eastern region to cope with weather fluctuations throughout the year.
Notice: This Is an AI-Generated Summary
Comments (0)